Team report
The sorting station goes at C
Aim: write the rule for a plastic-sorting station on the canal bank and choose the spot. The rule: at most 15 m from the path, at least 5 m from the water, at least 5 m of flat ground. Method: we measured A, B and C by perpendicular distance from the path, distance from the water and flat ground. Result: B is 20 m from the path (limit 15 m); A is 3 m from the water (at least 5 m needed). C has 14 m, 8 m and 6 m of flat ground, so all three conditions are met. Recommendation: put lidded PE, PVC and PS bins at C.
— 7-B team