AdvertisementYour brand could be hereYour brand hereOn every Darslab page · students, parents and teachersinfo@darslab.comAsk for pricesPricesinfo@darslab.com
☰ Year plan · Computing

Following a project plan

Week 29 · Unit 12: Be a problem solver · 3 lessons
1

Five stages of a plan

Computing 6: Unit 12, pp. 162–177
GoalName the five stages of a project plan in order and say what happens in each stage.
New words
project plan · a list of stages to follow when building a programrequirements · the things that the user needs the program to doimplementation · writing the program, using the designevaluation · checking whether the finished program meets the requirements
Explanation

A project plan helps us to build a program in an organised way. There are five stages. In Requirements we find out what the user needs. In Design we work out how the program will work, with algorithms or flowcharts. In Implementation we write the code. In Testing we run the program with different inputs and fix any errors that we find. In Evaluation we check that the program meets the requirements and we write down ideas for improvement. If the result is not good enough, we go round the stages again. Each time the program gets a little better.

StageThe question it answers
1 RequirementsWhat does the user need?
2 DesignHow will it work?
3 ImplementationHow do we build it?
4 TestingDoes it work with different inputs?
5 EvaluationDoes it meet the requirements, and what could be better?
Worked examples
StageWhat we do for the timer
Requirementsshow 10, 9, 8 … 1 and then say ‘Time is up!’
Designdraw a flowchart of the counting
Implementationbuild the blocks in Scratch
Testingrun it and check each number and the final message
Evaluationcheck the requirements and note ideas, for example a beep
Here is a project plan for a countdown timer for a science test. Each stage has its own piece of work.
Startset time to 10time > 0?yessay time for 1 secondchange time by -1nosay ‘Time is up!’End
This is the design stage. The flowchart uses a loop that runs while time is more than 0.
whenclickedsettimeto10saytimefor1secondschangetimeby-1repeat untiltime<1sayTime is up!for2seconds
This is the implementation stage. Each block matches a step of the flowchart. The program says 10, 9, 8 and so on down to 1, and then ‘Time is up!’.
Class activity

Plan a picnic (no computer): a project plan works for any job. Write the five stages on five cards and plan a class picnic with them. Requirements: who is coming, how many sandwiches? Design: a list and a map. Implementation: do the preparation. Testing: a small trial, such as packing one bag. Evaluation: after the picnic, what worked and what would you change? Then choose a program idea, such as a program that tells children which day the library is open, and write one sentence for each stage. If you have a computer or tablet, build the countdown timer in Scratch.

Practice
1
Put the stages in the right order: testing, requirements, evaluation, design, implementation.
2
Which stage is each task? (a) draw a flowchart, (b) type the blocks, (c) run the program with different inputs, (d) ask if the program does what the user asked, (e) list what the user wants.
TaskStage
(a) draw a flowchart?
(b) type the blocks?
(c) run with different inputs?
(d) ask if it does what the user asked?
(e) list what the user wants?
3
Name the missing stage in the plan for a pet-feeding reminder and say what happens in it.
StagePet-feeding reminder
Requirementsremind the family to feed the pet at 8 o’clock
Designa flowchart that compares the clock with 8
?—
Testingtry the times 7, 8 and 9
Evaluationask the family if the reminder is clear
4
Why can the stages be repeated more than once?