GoalPlan a small spreadsheet by choosing fields, data types, validation rules, formulas and a filter, and test it.
New words
field · one column of a table; it holds one kind of datarecord · one row of a table; all the facts about one thingfeature · a useful tool in a spreadsheet, such as a formula, validation or a filtertest plan · a list of checks that we make to see if the sheet works
Explanation
Before we build a spreadsheet, we plan it. First, decide what questions the sheet must answer. Then list the fields and choose a data type for each. Add a validation rule to the fields where mistakes are likely. Decide which formulas or functions are needed, and which filter will find the records that we want. Build the sheet and fill in some sample records. Last, test it with a test plan. Try wrong data, change a value and check the totals, and use the filter.
what questions?→fields and types→validation rules→formulas and filter→build→test
Worked examples
Field
Type
Validation rule
Reader
text
none
Book
text
none
Date finished
date
a date
Pages
number
whole number from 1 to 1000
A school book club wants to log what pupils have read. Here is the plan for its fields.
A
B
C
D
1
Reader
Book
Date finished
Pages
2
Ana
Sky Boat
3 Mar 2026
120
3
Ben
Red Door
9 Mar 2026
240
4
Chen
Tiny Seeds
15 Mar 2026
90
5
Dina
Night Train
21 Mar 2026
310
6
Ed
Blue Hill
28 Mar 2026
150
Here are five sample records. The club’s questions are answered by formulas and a filter. Total pages: =SUM(D2:D6) shows 910. Mean pages: =AVERAGE(D2:D6) shows 182. Filter Pages more than 200 shows rows 3 and 5.
Test
What should happen
type ‘lots’ in Pages
the sheet refuses it and shows an error message
change Chen’s pages from 90 to 100
the total changes from 910 to 920
filter Pages more than 200
only Ben and Dina are shown
clear the filter
all five records are shown again
A test plan says what to try and what should happen.
Class activity
Design a sheet (small groups). Choose a topic that you know about, such as the class plants, a sports day, a rainfall diary or a toy library. Fill in a planning card: three questions the sheet must answer, the fields, a data type and a validation rule for each field, one formula or function, and one filter. Make five sample records on paper and work out the answers by hand. Swap cards with another group. Can they follow your plan and find the same answers? Write three tests for their sheet.
Practice
1
A pupil plans a rainfall diary with the fields Date, Rainfall (mm) and Weather note. Choose a data type for each field, and write a validation rule for Rainfall.
Field
Example
Type
Date
5 Apr 2026
?
Rainfall (mm)
12
?
Weather note
windy
?
Date: date. Rainfall (mm): number. Weather note: text. A rule for rainfall: a number from 0 to 200 (or a number greater than or equal to 0).
2
Which rows are shown when the filter is ‘Rainfall greater than 5’?
Row
Day
Rainfall (mm)
2
Mon
4
3
Tue
0
4
Wed
12
5
Thu
7
6
Fri
2
Wed (12) and Thu (7). Mon is 4, Tue is 0 and Fri is 2, which are not more than 5.
3
The mean of the rainfall in B2:B6 is shown by =AVERAGE(B2:B5). What is wrong?
B7fx=AVERAGE(B2:B5)
A
B
1
Day
mm
2
Mon
4
3
Tue
0
4
Wed
12
5
Thu
7
6
Fri
2
7
Mean
5.75
The range ends at B5 and leaves out B6, so the mean is wrong. It should be =AVERAGE(B2:B6).
4
Write two tests for a rainfall diary sheet.
For example: type ‘wet’ in the rainfall column and check that it is refused; change one rainfall value and check that the total changes; filter for more than 5 mm and check which rows are left.